For PM's and PA's

Understand the what, when, and how of pushing your projects with resources sorted by phase.

Programming consists of establishing & documenting requirements for your project including: design objectives, desired rooms or spaces, room sizes, relationships between spaces and relationships to the site.

Learn more about Programming →


Pre-design is the phase of analysis that occurs after some form of funding is available and before design begins. During the pre-design phase, studies are done to analyze space requirement issues, the constraints and opportunities of the prop

Learn more about Pre Design →


Schematic design begins in rough form as sketches, floor plan studies, and 3d or physical models. Several owner/designer meetings are typical during this phase to make decisions and determine a direction for the design to evolve.

Learn more about Schematic Design →


The refinement and development of a design on it way to documentation is a great time to revisit refine performance strategies, better understand the details when choosing systems and assemblies, and prepare for CD's.

Learn more about Design Development →


The construction documents phase (blue prints) involves adding a level of detail and technical information to the design documents so a contractor has a set of instructions to build the project as designed. It also includes selecting and finalizing i

Learn more about Construction Documents →


Construction administration is as important as all of the other phases. There is a lot of information the contractor and sub contractors need to process. During this phase, we act as the owner’s agent and provide observation, review of submittal.

Learn more about Construction Administration →


Method of procurement usually refers to the principal contractual arrangement used in a particular project, e.g. traditional architectural commission, project management contract, design and construct contract, etc.” This module is mainly about the m

Learn more about Procurement →


The end of punch-lists not only marks the implementation of design and construction of a project help us build on successes through post-occupancy evaluations, interviews, and certification compliance.

Learn more about Post Construction →